Custom Extractor

The cold‑ethanol process, built to your throughput.
Get this line sized
Not sure it's the right size?Find your system in 7 questions
How it runs.
- Biomass load
- Cold-ethanol wash
- Solvent separation
- In-line winterization and filtration
- Solvent recovery
- Winterized crude
The spec sheet.
Specifications supplied by G-Force. Pricing depends on configuration.
- Cycle
- 30min
- Solvent recovery
- 98%
- Materials
- GMP-compliant
- Heating and chilling
- included
- Engineering
- optional full design
Where it fits in your line.
Get your line sized.
Tell us what you process, how much each month and what your processor charges you now. We'll send back the system that fits and the quote, next to what you pay to toll today. If tolling is still cheaper at your volume, we'll say so.
Don't have every number yet? Send what you have. We'll ask the rest.
Or call 978-265-1696